Click on image to view larger version.


Figure 003


Figure 3. Plots of cumulative earthquake counts as a function of time. Cutoff magnitude is 2. The mainshocks and the studied areas are indicated in each panel. Dashed lines are best fits to equation (3). The dotted line in (a) is the best fit to the first 60 days.