Click on image to view larger version.


Figure 003


Figure 3. Baseline-time plot of the Envisat orbits used in this study. The elevation change that would produce an interferometric fringe (i.e., altitude of ambiguity), which depends on the interferometric baseline, is given in gray boxes. Interferograms shown in Figure 4 are produced using the interferometric pairs connected with bold lines.